Ibbythe8356 Ibbythe8356
  • 04-05-2019
  • Social Studies
contestada

When planning your week the first thing to consider about each activity that your scheduling is its priority level?

Respuesta :

RyleeCanaan12 RyleeCanaan12
  • 04-05-2019

Answer:

yes

Explanation:

i think that if you are going to get things done, than you need to think about how important they are. if something is needed in two weeks, you can save that for later. if something is needed in two or three days, i would do that first. different people have different ways of planning, but that is my opinion

Answer Link

Otras preguntas

Can someone please help me with 11*3,56980
What was one of the reasons for moving to the west?
The following sequence is arithmetic. 3, 1, 5, 2, 6, 4…. true or false
the reduced fraction of 1902/21
Select the verb form that correctly completes the sentence. María _________ más sobre este tema después de terminar la clase. sabrá sabrémos sabré sabrá
why are some sites considered sacred in Judaism, Christinity and Islam?
44% of a number is 88. What is 1% of the number? A)   2 B)   38.72 C)   132 D)   200
during the childhood, physical development is ______ in infancy. The same rate More rapid Less rapid
7. The hypotenuse of a right triangle is 26 feet long. One leg of the triangle is 14 feet longer than the other leg. Find the lengths of the legs of the trian
Right triangle has one leg that is 13 cm the hypotenuse is 27 cm long find the area of the triangle to the nearest 10th