catwinz5105 catwinz5105
  • 02-10-2019
  • Business
contestada

How deep is the service duct bank measured from finish grade to the top of the concrete encasement that runs between the D.L. pad mount transformer and the main electrical switchboard

Respuesta :

RayCrochet RayCrochet
  • 03-10-2019

Answer:2' 6

Explanation:

E1.1

2 feer deep 6 inch divider

Answer Link

Otras preguntas

Which literary device best describes "The Golden 2 points Touch"? *
at which layer of the osi model would a logical address be added during encapsulation?
Will give brainliest
The post (deliver) at about 7o' clock every morning​
Look at the poster titled “Killing Time is Killing Men.” Based on the contents of the poster and its title, what message did this poster try to send workers dur
University of Florida football programs are printed 1 week prior to each home game. Attendance averages 90, 000 screaming and loyal Gators fans, of whom two-thi
I don’t get it here is a pic please lmk if you know what the answer is
Sự kiện nào đánh dấu giai đoạn giai cấp tư sản Ấn Độ bước lên vũ đài chính trị?
What is the square root of 16 ? Join 915 9482 0043 Gm1fgZ
Which shapes have exactly one line of symmetry?