matttmoney1221 matttmoney1221
  • 02-06-2016
  • Business
contestada

​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

The codon chart shown here uses the three base sequence found on the mrna molecule after the information is copied from dna during transcription. if the mrna me
Which of the following is true about immigration ? 1) immigrants are only allowed to enter countries if their hometown is overly populated 2) immigrants are not
Which of the following takes place after all of the events listed above before the bill can become a law?
83 as a percent?????????????????????????????????????????????????????????????????????????????????????????
According to Renaissance philosophy, commoners often represent
solve the equation 6x+2y=9 for y in terms of x
what is one of the factors that helped buddhism spread through china
Drug abuse can be very harmful to the body. Which of these best defines drug abuse? A. The use of an OTC drug for a medical condition B. The use of a drug
What is the alignment of the Earth, moon, and sun during a solar eclipse? Sun, Earth, moon Earth, sun, moon Earth, moon, sun Moon, sun, Earth
What is the simple interest for 1 year on a loan of $2000 at 9% interest?