how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

Who was known as the man that would banish the aristocratic rule ?
How do you think the point of view of a story affects the plot?
For every 10 middle school students in the us, 6 play sports. If there are 956 students how many play?
How to learn something fast
How many molecules are in 3.78 x 10^-3moles of water?
Find the slope of the line through the points (6,16) and (−6,4)
What is the arithmetic mean of the following numbers? 10.6.4.4.6.4.1
Mutineers rebelled and ended the La Salle expedition. a. People who stage a revolt against authority. b. A group of people who leave their country to form a new
A picture is x+20 cm in width and 2x-10 cm in length. The frame is a constant 5 cm wide from the edge of the picture to the outside of the frame. What is the ar
y=-2x -5graph the line​