ginapogones6676 ginapogones6676
  • 02-07-2021
  • Business
contestada

A costing system that uses actual costs for direct materials and labor and predetermined overhead rates to apply overhead is called a(n)

Respuesta :

topeadeniran2 topeadeniran2
  • 07-07-2021

Answer: normal costing system

Explanation:

A costing system which uses the actual costs for direct materials and the labor and predetermined overhead rates to apply overhead is referred to as the normal costing system.

Normal costing system is the cost allocation method whereby cost is assigned to products which are based on the labor, materials, and the overhead which are used in their production.

Answer Link

Otras preguntas

how do you write 4540 million in standard form?
What were the major causes of WWII? Please include at least 4 answers.
how were north american colonies all similar in the 1700s?
What is the least common denominator for 5/6 and 3/8. 3/4 and 6/7
What were the major causes of WWII? Please include at least 4 answers.
in the number 13,407.036 there are two 3's. Explain how the values of the 3's are related.
Why is sodium sulphate hemihydrate called as "Plaster of Paris"?
Simplify the expressions: cot 0 sec 0 A. Sin0 B. Csc0 C. Cos0 D. Cos* 0
how were north american colonies all similar in the 1700s?
how do you write 4540 million in standard form?