It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

Respuesta :

Esther
Esther Esther
  • 03-03-2022

Answer:

20 days

Step-by-step explanation:

It takes 12 men 5 days to complete a job. Work out how many days it would take 3 men to complete the same job.

12 * 5 = 60

60/3 = 20

It will take 3 men 20 days to do the same job

Answer Link

Otras preguntas

Particles q1, 92, and q3 are in a straight line. Particles q1 = -1.60 x 10-19 C, 92 = +1.60 x 10-19 C, and q3 = -1.60 x 10-19 C. Particles qi and q2 are separat
Thomas is 160cm tall and his brother Tom is /8 tall as him. How tall is Tom?
Help me find the value of X please
Prism A has a volume of 60 cubic units and a height of 12 units. Prism B has the same base area and height but a length of 15 units for the longest edge
Find the surface area of the right prism :​
help i’m confused‍♀️ kinda forgot what a inequality is over quarantine lol
Find the missing length indicated A) 25 B) 5 C) 8 D) 3
Which is the slop of the line that passes through the points (-3, 1) and (4, -2)?A.) slope = -3B.) slope = -3/7C.) slope = 1/2D.) slope = -7/3​
Que se entiende por absolutismo monárquico​
You pick a card at random. 4 5 6 6 7 8 9 )) What is P(prime)? Write your answer as a fraction or whole number.​