celise2600 celise2600
  • 04-03-2022
  • Physics
contestada

A heat turbine can generate a maximum power of 250 MW. How much work can the turbine do in
7.8 min?

Respuesta :

Аноним Аноним
  • 04-03-2022

Answer:

1.17 x 10¹¹ J

Explanation:

250 MW = 250 x 10⁶ W

7.8 min = 468 s

P = W/t

W = Pt

   = 250 x 10⁶ x 468

   = 117000 x 10⁶

   = 1.17 x 10¹¹ J

Answer Link

Otras preguntas

is energy released or absorbed during the formation of a solution?
What is the volume of the figure? A. 75 cubic units B. 125 cubic units C. 375 cubic units D. 750 cubic units
Which statement best describes the United States' changing role in the world during the twentieth century? a:It changed from a great power into an isolationist
Which region of Washington has the diversity of the beaches of the Pacific Ocean, the Straits of Juan de Fuca, valleys, mountains and rain forest. Olympic Penin
In Sara sees red how does the mountain trail seem different to Sara when she sees the injured woman than it had seem to her in the past
What is the opposite of grew?
Please help! Sarai uses 4 cm3 of face wash each night. The cylindrical container of face wash is 10 cm tall and has a diameter of 5 cm. The container is half em
Twelve of the 40 cars pulled by the locomotive were tankers. A. What Fraction of the cars were tankers? B. What Percent of the cars weren't tankers? Thanks So S
is energy released or absorbed during the formation of a solution?
what is a system for mapping around earth on a flat surface called