ellz7oetugaalagirl ellz7oetugaalagirl
  • 02-03-2017
  • Computers and Technology
contestada

To reduce chances of system failure, engineers may use _____ .

Respuesta :

MissPhiladelphia
MissPhiladelphia MissPhiladelphia
  • 15-03-2017
To reduce chances of system failure, engineers may use process control. This is a system which involves activities that ensures the whole process variables can be predicted and controlled to prevent failure. This involves the use of safety valves and sensors.
Answer Link
reyesandrew002 reyesandrew002
  • 13-07-2018

Performance testing // Gradpoint Homies

Answer Link

Otras preguntas

How did the majority of Supreme Court justices in the case of Plessy v. Ferguson interpret the 14th Amendment? A. All citizens are equal under the law and there
what is the term of office for supreme court justices? when can they be removed?
What is 14.613 rounded to the nearest tenth?
how do change 6.625 into fraction
Which word correctly completes the sentence? An __________ design influences the materials the builder will use. A. architects B. architects'
What is one difference between a primary oocyte and a secondary oocyte in humans?
Education was important to former slaves because...
Jacinta is working on a jigsaw puzzle that has 403 pieces. She has completed 1/4 of the puzzle. About how many pieces has she placed in the puzzle
What is the direct variation equation if f(x) varies directly with x and f(x) = –12 when x = 6? (Points : 1) f(x) = –2x f(x) =-1/2x f(x) = –6x f(x) = –18x
Evaluate each expression. 1. 56/b for b=7 2. v+16 for v=9 3.2(4e) for e=5