carlos907030 carlos907030
  • 01-08-2017
  • Mathematics
contestada

if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

Which of the following terms best describes any solution? a)homogeneous b)heterogeneous c)dilute d) saturated
at least one would be extremely helpful. but if possible it would be nice if all three could be answered with reasoning so i can understand it a bit better
Is the following relation a function?​
(-2/7) (5/-8) please solve
Find the perimeter of this figure. Answers choices 40 m 20 m 100 m 80 m
Explain why a roller coaster’s second hill cannot be taller than the first hill.
Using the tax table, determine the amount of taxes for the following situations: (Do not round intermediate calculations. Round your answers to 2 decimal places
How many gametes are produced during meiosis
6. The temperature of a mass of tin increases from 24.0 degrees C to 34.0 degrees C when 250 J of thermal energy are added. Calculate the mass of the tin. The
Please help me with this math question!