How much work is done when a hoist lifts a 290-kg rock to a height of 7 m?

Respuesta :

samuraijack
samuraijack samuraijack
  • 03-01-2018
Given: Mass m = 290 Kg;  Height  h = 7 m

Required: Work = ?

Formula: Work = Force x distance  but, Force F = mg

W= fd

W = mgh

W= (290 Kg)(9.8 m/s²)(7 m)

W = 19,894 Kg.m²/s²

W = 19,894  J




  
Answer Link

Otras preguntas

According to the article, which economic event sparked the decade-long economic crisis? the Nixon administration’s wage and price “freeze” the Carter administra
Which polynomial represents the sum below? (2x6 + 3x2 + 9) + (3x2 + x + 8) A. 5x8 + 3x4 + x + 17 B. 5x8 + 3x2 + x + 17 C. 2x6 + 6x3 + 17 D. 2x6 + 6x
Perimeter and Area Geometry help, please don't comment if you aren't 100% sure. Will give Brainliest and upvote
The double helix of dna in the b-form is stabilized by:
When evaluating the amount of bacteria in a habitat, why is the number of colonies a better indicator than the size of the colonies?
Select the best answer for the question. 2. In the sports section of the local newspaper, a reporter wrote, "Lorton's experienced quarterback performed well i
i'm not quite sure how to do this
Review the noble gases in the periodic table. As molar mass increases, the number of electrons increases, resulting in more dipole-dipole interactions. greater
Como se define el trabajo de energia en fisica?
Liz wants to buy her favorite musical group's new CD. The CD costs $15.24, including tax. Liz gives the store clerk a twenty-dollar bill. How much change should