boand3
boand3 boand3
  • 04-05-2018
  • Mathematics
contestada

A construction company needs to remove 2 1/6 tons of dirt from a construction site. They can remove 7/8 tons of dirt each hour. What is the total number of hours it will take to remove the dirt?

Respuesta :

jupjupjupjup202 jupjupjupjup202
  • 04-05-2018
The answer is 4.

Hope I helped :)
Answer Link

Otras preguntas

DNA is copied, in a process called _______, so that a cell's DNA can be passed on to its daughter cells. A. recombination B. replication C. gene exp
plz help I need the answer plz
consider the two similar water bottles for athletes
1024 cm is equal to how many meters
what is the difference between the soluble and insoluble substances​
Penn Foster exercise 5
The components of the human body. from organ systems to cell organelles, interact to maintain a balanced intemal environment. To successfully accomplish this ta
radius of cylinder = 5 cm radius of cone = 4 cm A cylinder has a height of 16 cm and a radius of 5 cm A cone has a height of 12 cm and a radius of 4 cm. If the
Given: circle k(O), m LM = 164° m WK = 68°, m∠MLK = 65° Find: m∠LMW
What does the expression oh beans mean?